Unergy
  • β˜€οΈIntroduction
    • Abstract
    • Motivation
  • πŸ”ƒProtocol
    • Introduction
    • The uWatt: A stable currency collateralized in clean energy
      • uWatt reference value
    • Project origination
      • pWatt tokens
      • Project milestones
    • The Swap
      • Swapping pWatts into uWatts
      • External pWatt holders
      • Swap factor
      • pWatts β€˜outside’ the Reserve
    • Energy tokenization and generation tracking
      • Tracking of energy monetization
      • Renewable Energy Certificates (RECs)
    • Management of funds in the Reserve
      • Collecting project income
      • Operation and maintenance expenses
      • Liquidity pool funding
      • Depreciation compensation
        • Asset value calculation
        • Asset depreciation compensation
        • Avoiding overcompensation
      • Distribution of rewards
  • πŸ—³οΈGovernance
    • Overview
    • Choosing the cash flow discount rates
    • Protocol upgrades
    • Milestone validation
  • πŸ’‘Remarks
    • Types of projects
      • Self-consumption projects
      • Utility-scale solar energy Projects
    • Nature of the Unergy Protocol tokens
      • Nature of the uWatt token
      • Nature of the pWatt tokens
    • Incentives for funding Projects
  • πŸš’Risks and mitigation
    • Origination risks
      • Delays in the construction or procurement phase
      • Failure to install the Project
    • Real-world funds management
    • Project qualification
      • Technical feasibility
      • Financial feasibility
    • Installer qualification
  • πŸ““Miscellaneous
    • Protocol implementation
    • Definitions and terminology
Powered by GitBook
On this page

Was this helpful?

  1. Risks and mitigation
  2. Project qualification

Technical feasibility

The following factors are taken into account:

  • Availability of the capacity of the transformer station, electrical wiring and power transmission line

  • Energy demand in the area should allow the connection of the Project, else, electrical losses could occur and render the project unviable

  • The land property proposed for the Project installation should comply with certain requirements, such as an average slope of less than 10 degrees, should have a low risk of flooding, and should have the permits from the local environmental authority to remove or relocate any trees that are in the place of the Project.

PreviousProject qualificationNextFinancial feasibility